Building the bridge
The first sod was turned on 28 July 1923. John Bradfield of the New South Wales Department of Public Works directed the project, and Dorman Long of Middlesbrough designed the final arch and built it. Work on the arch began on 26 October 1928, and its two halves met on 19 August 1930.


Opened in 1932
The bridge opened on 19 March 1932. Six million rivets hold its steel together, and its summit stands 134 metres above sea level. Sixteen workers died during its construction.